Sectors

Tons: 3,500

Contractor: Lane Construction Group

Structural Engineer: Finley Engineering Group and HDR Engineering

Designer: AECOM

Owner: TxDOT

IH-35 Extradosed Bridges over the Brazos River

Waco, Texas

This signature project for Hirschfeld consists of North Bound and South Bound extradosed bridges located next to the new Baylor Stadium in Waco. The extradosed bridge system is a hybrid design between a girder bridge and a cable-stayed bridge, and is reportedly only the third location in the U.S. to use an extradosed bridge design. Hirschfeld’s contract with our customer, Lane Construction Group, included 3,500 tons of steel box girders.

To learn more about this project, please click link to see Roads & Bridges article.


Site by Bronson Ma Creative