Tons: 2,219

Contractor: Archer Western - Herzog

Owner: Dallas Area Rapid Transit Authority

Dallas Area Rapid Transit (DART)
Authority NW-1B Project

Dallas, Texas

This project consisted of seven different bridge structures ranging from two simple wide flange structures, three fracture critical plate girder structures and two thru girder heavy rail bridges. The bridges were designed and installed in order to expand and improve the existing light rail mass transit system. The project will bring this section of the rail system into alignment with the planned electrified double tracks with 15’-6” centers and a maximum design speed of 65 mph.